Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/04/1948
The year in which a vessel’s construction is completed.
1943
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Odenbach Ship Builders Corp
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Certificate of Class
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Name of the individual/entity/organisation responsible for authoring the record
P E Clement; R T Garrett
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Carrying Petroleum in Bulk; For Service on the Atlantic & Mediterranean Coasts of French North Africa & Spanish Morocco Including Tangier & Gibraltar; Specially Surveyed La Rochelle 3,48
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
Petroleum in bulk
Name of ship as recorded on the record
El Karim
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1943
The port or place in which the vessel’s construction took place, at the time of writing.
Rochester, New York
The port in which a vessel is registered or permanently based.
Fédala
The individual and/or organisation listed
Cie Marocaine de Transports Maritimes
Location where the document is written.
London
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Motor Vessel
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
632
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.