Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/05/1938
The year in which a vessel’s construction is completed.
1938
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Helsingborgs Varfs A B
The port or place in which the vessel’s construction took place, at the time of writing.
Helsingborg
Additional numbers that feature on a given record that may be used for identification.
35672
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Helsingborg
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; strengthened for navigation in ice (contemplated)
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Miramar
The process of transferring a vessel to water, but not necessarily her completion.
30/04/1938
Unique identifier for a given ship, it is assigned by a builder.
58
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 (Comp.) - Surveys for Freeboard
The port in which a vessel is registered or permanently based.
Gothenburg
Name of the individual/entity/organisation responsible for authoring the record
P O Sjogren
Location where a vessel’s survey was undertaken.
Helsingborg
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.