Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/10/1938
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Newport News Shipbuilding & Dry Dock Co
The port or place in which the vessel’s construction took place, at the time of writing.
Newport News, VA
Additional numbers that feature on a given record that may be used for identification.
25990
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
21/10/1938
Location where the document is written.
Shanghai
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
2
Name of ship as recorded on the record
Munlock
The process of transferring a vessel to water, but not necessarily her completion.
15/03/1917
Unique identifier for a given ship, it is assigned by a builder.
200
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C11 Surveys for Freeboard - Conditions of Assignment
The port in which a vessel is registered or permanently based.
Shanghai
The date of first visit by a surveyor.
20/10/1938
Name of the individual/entity/organisation responsible for authoring the record
G Pickering
Location where a vessel’s survey was undertaken.
Shanghai
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.