Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/12/1916
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Cran & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Leith
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
36605
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Leith 15152
The date of first visit by a surveyor.
23/05/1916
Name of the individual/entity/organisation responsible for authoring the record
Peter McGregor
Name of surveyor.
Peter McGregor
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Lth FE Rpt No 15152
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Date in which construction of a vessel’s engines were completed.
1917
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
William Poulsom
The process of transferring a vessel to water, but not necessarily her completion.
28/11/1916
Unique identifier for a given ship, it is assigned by a builder.
109
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
29/12/1916
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
11/04/1917
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Leith
John Cran & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Have you noticed missing or incorrect data or images for this document?