Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
30/10/1925
The year in which a vessel’s construction is completed.
1926
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
J Meyers Shipbuilding Co
The port or place in which the vessel’s construction took place, at the time of writing.
Zaltbommel
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
45151
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Rotterdam 15418
The date of first visit by a surveyor.
29/04/1924
The individual and/or organisation listed
James Dredging Co Ltd
Location where the document is written.
Glasgow
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See Rot F E Rpt No 15418
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Coatbridge
William Beardmore & Co
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Foremost 36
The process of transferring a vessel to water, but not necessarily her completion.
07/05/1926
Unique identifier for a given ship, it is assigned by a builder.
499
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
27/10/1925
Name of the individual/entity/organisation responsible for authoring the record
H Y Bell
Location where a vessel’s survey was undertaken.
Coatbridge
Date of the meeting of the Classing Committee.
17/12/1926
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion
Date in which construction of a vessel’s engines were completed.
1924
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.