Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

30/10/1925

The year in which a vessel’s construction is completed.

Year of ship completion

1926

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

J Meyers Shipbuilding Co

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Zaltbommel

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

45151

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Rotterdam 15418

The date of first visit by a surveyor.

Date of first survey

29/04/1924

The individual and/or organisation listed

Ship owner

James Dredging Co Ltd

Location where the document is written.

Location of Document Creation

Glasgow

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Rot F E Rpt No 15418

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Location of construction for a vessel’s engines.

Location of engine build

Coatbridge

Engine builder as written

William Beardmore & Co

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Name of ship as recorded on the record

Ship name

Foremost 36

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

07/05/1926

Unique identifier for a given ship, it is assigned by a builder.

Yard no

499

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Gls

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

4 Report on Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

27/10/1925

Name of the individual/entity/organisation responsible for authoring the record

Document author

H Y Bell

Location where a vessel’s survey was undertaken.

Location of Survey

Coatbridge

Date of the meeting of the Classing Committee.

Date of Classing committee

17/12/1926

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Triple Expansion

Date in which construction of a vessel’s engines were completed.

Year of engine build

1924

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.