Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
16/09/1937
The year in which a vessel’s construction is completed.
1924
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Lithgows Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
C12(a) Freeboard Verification Form for Ordinary Ca
The port in which a vessel is registered or permanently based.
London
The individual and/or organisation listed
Campden Hill Steamship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
J S Thomson
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Pearlstone
The process of transferring a vessel to water, but not necessarily her completion.
09/04/1924
Unique identifier for a given ship, it is assigned by a builder.
754
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
GKCL
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Glasgow 58883
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Counties Ship Management Co Ltd
Location where the document is written.
Glasgow
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
4895
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Title of Document has been Altered
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.