Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

30/08/1917

The year in which a vessel’s construction is completed.

Year of ship completion

1918

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Cochrane & Sons Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Selby

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Lloyd's 2891N WC

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

30/08/1917

Location where the document is written.

Location of Document Creation

Newcastle

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

A vessel’s calculated maximum speed.

Speed (knots)

1917

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Christopher Dixon

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

04/09/1917

Unique identifier for a given ship, it is assigned by a builder.

Yard no

823

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

6 Ship Forgings

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Hull 30336

The date of first visit by a surveyor.

Date of first survey

13/06/1917

Name of the individual/entity/organisation responsible for authoring the record

Document author

William Campbell

Name of surveyor.

Surveyor

William Campbell

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Draft

1917

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Ship Forgings No 15717; Manufactured by Emerson Walker & Thompson Bros of Dunston on Tyne

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.