Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
20/12/1911
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hall, Russell & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Aberdeen
The port in which a vessel is registered or permanently based.
North Shields
The individual and/or organisation listed
Richard Irvin & Sons Ltd
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
John High
Broad categories and subdivisions of vessels related to their purpose or function.
Screw Steamer
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Inverted Direct acting Triple Expansion Condensing
Date in which construction of a vessel’s engines were completed.
1911
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1911
Physical extent of a record.
1
Name of ship as recorded on the record
James Pitchers
The process of transferring a vessel to water, but not necessarily her completion.
02/12/1911
Unique identifier for a given ship, it is assigned by a builder.
503
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
GR130 Vessels of 100 tons & upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Richard Irvin
Location where the document is written.
North Shields
Physical arrangement of a ship’s masts, sails and rigging.
K - Ketch
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
197
Location of construction for a vessel’s engines.
Aberdeen
Hall Russell & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1911
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.