Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

10/10/1957

The year in which a vessel’s construction is completed.

Year of ship completion

1932

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

N V Maatschappij voor Scheeps en Werktuigbouw Fijenoord

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Rotterdam

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

12220

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Singapore 11930

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

03/10/1957

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Ship manager

Shell Tankers N V

Location where the document is written.

Location of Document Creation

Singapore

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 Carrying Petroleum in Bulk; Dkg 2,57; SS H Kg (Dr) 3,57; +LMC CS 3,57; DBS 3,57; TS (CL) P & S 5,56; SPS 5,56; Mchy Aft

A vessel’s means of propulsion.

Propulsion

undefined

Is the steamer assisted by sail?

Sail assisted steamer

No

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Oil Eng 4 SA each 5 Cy

Engine builder as written

N V Werkspoor

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for breaking up, Demolition Commenced

Vessel’s area of loss or disposal/last known recorded location.

Area of ship loss

Hirao

Recorded information relating the specific cargo being conveyed.

Cargo

Petroleum in bulk

Name of ship as recorded on the record

Ship name

Malvina

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

10/06/1931

Unique identifier for a given ship, it is assigned by a builder.

Yard no

320

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Sng

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

9 Report of Periodical Surveys & Repairs of Machinery

The port in which a vessel is registered or permanently based.

Port of registry

Hague

The date of first visit by a surveyor.

Date of first survey

03/10/1957

The individual and/or organisation listed

Ship owner

N V Petroleum Maats La Corona

Name of the individual/entity/organisation responsible for authoring the record

Document author

W N Taylor

Location where a vessel’s survey was undertaken.

Location of Survey

Singapore

Date of the meeting of the Classing Committee.

Date of Classing committee

29/10/1957

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

8245

Date in which construction of a vessel’s engines were completed.

Year of engine build

1932

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Broken up

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Yamaguchi Prefecture

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

01/02/1961

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.