Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
28/04/1951
The year in which a vessel’s construction is completed.
1952
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Hindustan Shipyard Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Vizagapatam
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
24395
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Greenock 24232
The date of first visit by a surveyor.
20/02/1948
The individual and/or organisation listed
Scindia Steam Navigation Co Ltd
Location where the document is written.
Greenock
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
See FE Mchy Rpt Cal
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Greenock
John G Kincaid & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for breaking up, Demolition Commenced
Physical extent of a record.
1
Name of ship as recorded on the record
Jag Rani
The process of transferring a vessel to water, but not necessarily her completion.
15/12/1951
Unique identifier for a given ship, it is assigned by a builder.
VC108/G4
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
4 Report on Steam Reciprocating Engine Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
06/04/1951
Name of the individual/entity/organisation responsible for authoring the record
Charles N Hunter
Location where a vessel’s survey was undertaken.
Greenock
Date of the meeting of the Classing Committee.
18/07/1952
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Inverted Triple Expansion
Date in which construction of a vessel’s engines were completed.
1951
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Bombay
Have you noticed missing or incorrect data or images for this document?