Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
24/04/1959
The year in which a vessel’s construction is completed.
1941
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cook Welton & Gemmell Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13498
The port in which a vessel is registered or permanently based.
London
The date of first visit by a surveyor.
06/04/1959
The individual and/or organisation listed
Limerick Steam Ship Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
C Moffatt
Location where a vessel’s survey was undertaken.
Penzance
Date of the meeting of the Classing Committee.
21/05/1959
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
563
Date in which construction of a vessel’s engines were completed.
1941
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Wrecked
Vessel’s place of loss or disposal/last known recorded location.
Galway Bay
Physical extent of a record.
1
Name of ship as recorded on the record
Plassy
The process of transferring a vessel to water, but not necessarily her completion.
02/10/1940
Unique identifier for a given ship, it is assigned by a builder.
669
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Fal
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
9 Report of Periodical Surveys & Repairs of Machinery
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
14/04/1959
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
S J Roycroft
Location where the document is written.
Falmouth
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 5,58; SS Cff 4,56; +LMC CS 4,56; Lloyds A & CP; TS (OG) 5,57; Oil Engine
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Oil Engine 2 S A 8 Cylinders
Crossley Bros Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded on Rock & Broken up in Heavy Seas
Recorded date for the vessel’s loss or disposal.
08/03/1960
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.