Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
08/03/1930
The year in which a vessel’s construction is completed.
1930
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Smith's Dock Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Southbank on Tees
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
2353
Additional numbers that feature on a given record that may be used for identification.
No 2061; No in Register Book 3761
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
18/02/1930
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
The Wyre Steam Trawling Co Ltd
Location where the document is written.
Middlesbrough
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
BS Asterisk; Fishing Purpose
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
310
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
1930
Pertinent, useful or interesting recorded content.
This is a British Corporation Document. Vessel has been classed by British Corporation; Also refers to Vessel Honjo
Name of ship as recorded on the record
Fane
The process of transferring a vessel to water, but not necessarily her completion.
16/01/1930
Unique identifier for a given ship, it is assigned by a builder.
911
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
British Corporation for the Survey & Registry of Shipping Report of Hull & Equipment
The port in which a vessel is registered or permanently based.
Fleetwood
The date of first visit by a surveyor.
21/09/1929
The individual and/or organisation listed
The Wyre Steam Trawling Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
John Aitken; J L Adam; John Flemming
Location where a vessel’s survey was undertaken.
Southbank
Date of the meeting of the Classing Committee.
20/09/1929
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
h 1930
Physical extent of a record.
46
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.