Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

14/02/1955

The year in which a vessel’s construction is completed.

Year of ship completion

1941

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Clelands (Successors) Ltd

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Willington Quay on Tyne

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

Newcastle 112193

Name of the individual/entity/organisation responsible for authoring the record

Document author

S Blakeman

The name of the port/place from which a vessel’s voyage originated.

Voyage from

London

The name of the port/place of destination given.

Destined voyage

Leith

A vessel’s means of propulsion.

Propulsion

Motor (internal combustion)

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

Foundered

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Havre

Physical extent of a record.

Number of parts

1

Name of ship as recorded on the record

Ship name

Northgate

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

03/09/1940

Unique identifier for a given ship, it is assigned by a builder.

Yard no

54

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Certificate of Survey of Machinery

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

Location where the document is written.

Location of Document Creation

Newcastle Upon Tyne

Recorded information related to a vessel’s movements.

Voyage information

London; Leith

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

429

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sprang a Leak & Sank, Total Loss

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

24/03/1963

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of document has been altered

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.