Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
21/01/1953
The year in which a vessel’s construction is completed.
1952
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
A-B Lindholmens Varv
The port or place in which the vessel’s construction took place, at the time of writing.
Gothenburg
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Gothenberg 19510; Stockholm 8937
Location where the document is written.
London
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
A vessel’s calculated maximum speed.
1953
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Aguilar & Peris S L for Breaking up at Valencia
1953
Name of ship as recorded on the record
Petra Dan
The process of transferring a vessel to water, but not necessarily her completion.
18/09/1952
Unique identifier for a given ship, it is assigned by a builder.
1028
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Oil Engines 2 S C S A 8 Cylinder
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Valencia
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.