Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

16/04/1942

The year in which a vessel’s construction is completed.

Year of ship completion

1941

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Bethlehem Sparrows Point Shipyard Inc

Unique identifier for a given ship, it is assigned by a builder.

Yard no

4356

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Bal

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

13 Report on Electrical Equipment

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

N

The date of last visit by a surveyor.

Date of latest survey

10/02/1942

Name of the individual/entity/organisation responsible for authoring the record

Document author

William C Cowin

Location where a vessel’s survey was undertaken.

Location of Survey

Baltimore

Date of the meeting of the Classing Committee.

Date of Classing committee

27/05/1942

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Vessel’s place of loss or disposal/last known recorded location.

Place of ship loss

Hamburg

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Also refers to vessels Corsicana; Caddo & Calusa

Name of ship as recorded on the record

Ship name

Catawba

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

23/12/1941

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

F A Hodge

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Sparrows Point, Maryland

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

7654

The listed port to which a given vessel belongs.

Port belonging to

New York

The date of first visit by a surveyor.

Date of first survey

04/12/1941

The individual and/or organisation listed

Ship owner

Socony-Vacuum Oil Co Inc

Location where the document is written.

Location of Document Creation

Baltimore

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Elec Light

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

9930

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold to Eckhardt & Co for Breaking up at Hamburg

Physical extent of a record.

Number of parts

2

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.