Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
29/09/1922
The year in which a vessel’s construction is completed.
1922
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Robert Duncan & Co Ltd
Unique identifier for a given ship, it is assigned by a builder.
349
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
The listed port to which a given vessel belongs.
Glasgow
The date of first visit by a surveyor.
24/05/1922
The individual and/or organisation listed
The British India Steam Navigation Co Ltd
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
17/10/1922
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7241
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers at Odense
Physical extent of a record.
1
Name of ship as recorded on the record
Durenda
The process of transferring a vessel to water, but not necessarily her completion.
28/03/1922
Name of the shipbuilder as it appears on the record.
A Kelly
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
13 Report on Electric Fittings
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/10/1922
Name of the individual/entity/organisation responsible for authoring the record
J S Rankin
Name of surveyor.
J S Rankin
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Elec Light
A vessel’s means of propulsion.
Motor (internal combustion)
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Odense
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.