Document
Document
  • Related documents Related
  • Full details Details
  • Report document? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

17/07/1948

The year in which a vessel’s construction is completed.

Year of ship completion

1921

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Akt Ges Vulcan

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Boa

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

1 Steel Steamer or Motorship

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

Y

The date of last visit by a surveyor.

Date of latest survey

17/07/1948

Location where the document is written.

Location of Document Creation

Balboa

Location where a vessel’s survey was undertaken.

Location of Survey

Salina Cruz

Date of the meeting of the Classing Committee.

Date of Classing committee

16/02/1949

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

4323

Is machinery fitted at the aft of the vessel?

Machinery aft?

No

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal

Sold for Breaking up

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Title of Document has been Altered

Name of ship as recorded on the record

Ship name

Ultramarino

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

__/__/1921

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Stettin

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

2622

The port in which a vessel is registered or permanently based.

Port of registry

Oporto

The date of first visit by a surveyor.

Date of first survey

02/10/1946

Name of the individual/entity/organisation responsible for authoring the record

Document author

William Bennett; William C Cowin

Name of surveyor.

Surveyor

William Bennett

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

See Nos Rpt No 6881

A vessel’s means of propulsion.

Propulsion

Steam

Is the steamer assisted by sail?

Sail assisted steamer

No

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No

Does the vessel possess an auxiliary power source?

Auxillary

No

Is electric lighting fitted to the vessel?

Electric light fitted?

No

The official record pronounced by the Committee

Loss or disposal

To be broken up

Physical extent of a record.

Number of parts

1

Report an issue with this document

Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.