Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
23/05/1940
The year in which a vessel’s construction is completed.
1940
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
W J Yarwood & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Northwich
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Vessels 100 Tons & Upwards
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
London
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
161
Location of construction for a vessel’s engines.
Northwich
W J Yarwood & Sons Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Name of ship as recorded on the record
Sparkler
The process of transferring a vessel to water, but not necessarily her completion.
19/02/1940
Unique identifier for a given ship, it is assigned by a builder.
625
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
MDRY
The port in which a vessel is registered or permanently based.
London
The individual and/or organisation listed
The Commissioners for Executing the Office of Lord High Admiral; The Secretary of the Admiralty
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Type and configuration of the engine(s) supplied for a vessel.
Triple Direct Acting Type
Date in which construction of a vessel’s engines were completed.
1939
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?