Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
31/10/1941
The year in which a vessel’s construction is completed.
1941
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Doxford & Sons Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Sunderland 33234; Glasgow 64078; Middlesbrough 17078
A vessel’s means of propulsion.
undefined
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Wrecked
Recorded date for the vessel’s loss or disposal.
06/12/1961
Name of ship as recorded on the record
Empire Raleigh
The process of transferring a vessel to water, but not necessarily her completion.
12/06/1941
Unique identifier for a given ship, it is assigned by a builder.
677
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Predominant material(s) utilised in a vessel’s construction.
Steel
Type and configuration of the engine(s) supplied for a vessel.
Oil Engines 2 S C S A
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Stranded, Constructive Total Loss
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.