Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
17/07/1959
The year in which a vessel’s construction is completed.
1935
Unique identifier for a given ship, it is assigned by a builder.
948
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Cff
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
8 Report of Ship Surveys & Repairs
The port in which a vessel is registered or permanently based.
Ardrossan
The date of first visit by a surveyor.
13/07/1959
The individual and/or organisation listed
Hogarth Shipping Co Ltd
Name of the individual/entity/organisation responsible for authoring the record
James W N Keay
Location where a vessel’s survey was undertaken.
Cardiff
Date of the meeting of the Classing Committee.
12/08/1959
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
The country or national waters where a vessel is lost/disposed of, or last recorded.
Japan
Name of ship as recorded on the record
Baron Cawdor
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
D & W Henderson & Co
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
60899
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Swansea 26389
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
16/07/1959
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
H Hogarth & Sons Ltd
Location where the document is written.
Cardiff
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
DS 7,59
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3721
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold to Shipbreakers for Breaking Up at Japan
Physical extent of a record.
2
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.