Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
09/11/1960
The year in which a vessel’s construction is completed.
1908
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R Stephenson & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Hebburn on Tyne
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
BS Asterisk; Great Lakes Service 8,57; S S Lake 8,57; A S 4,58; MBS Asterisk 4,54; BS M 2,59; Sp 1,57; TS 8,57; CL
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
Broken up
Vessel’s place of loss or disposal/last known recorded location.
Hamilton
Physical extent of a record.
1
Name of ship as recorded on the record
Beaverton
The process of transferring a vessel to water, but not necessarily her completion.
16/04/1908
Unique identifier for a given ship, it is assigned by a builder.
118
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
15603
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Date of the meeting of the Classing Committee.
11/11/1960
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
2012
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Broken Up
Vessel’s area of loss or disposal/last known recorded location.
Ontario
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.