Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/10/1927
The year in which a vessel’s construction is completed.
1927
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Cook Welton & Gemmell Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Beverley
Additional numbers that feature on a given record that may be used for identification.
Lloyd's 268 JKW
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
13/08/1927
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Charles D Holmes & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up
Pertinent, useful or interesting recorded content.
Engine Forgings or Castings, manufactured by Bochumer Verein of Bochum
Name of ship as recorded on the record
St Melante
The process of transferring a vessel to water, but not necessarily her completion.
15/08/1927
Unique identifier for a given ship, it is assigned by a builder.
489
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
7 Engine Forgings or Castings
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Hull 38385
The date of first visit by a surveyor.
20/07/1927
Name of the individual/entity/organisation responsible for authoring the record
John H Mackirdy; J K Williams
Predominant material(s) utilised in a vessel’s construction.
Steel
Location of construction for a vessel’s engines.
Hull
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Physical extent of a record.
1
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.