Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
06/08/1917
The year in which a vessel’s construction is completed.
1917
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
The Dublin Dockyard & Co Ltd
The port or place in which the vessel’s construction took place, at the time of writing.
Dublin
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
37143
The listed port to which a given vessel belongs.
London
The date of first visit by a surveyor.
14/06/1916
The individual and/or organisation listed
South Metropolitan Gas Co
Name of the individual/entity/organisation responsible for authoring the record
G D Ritchie; H C Forster
Name of surveyor.
H C Forster
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Transmit to London
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Location of construction for a vessel’s engines.
Greenock
John G Kincaid & Co Ltd
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up
Recorded date for the vessel’s loss or disposal.
02/07/1959
Name of ship as recorded on the record
Lambeth
The process of transferring a vessel to water, but not necessarily her completion.
02/08/1917
Unique identifier for a given ship, it is assigned by a builder.
92
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
5a Report on Boilers
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
The date of last visit by a surveyor.
06/08/1917
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J P Le Touze
Location where the document is written.
Glasgow
Location where a vessel’s survey was undertaken.
Glasgow
Date of the meeting of the Classing Committee.
11/12/1917
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1536
Date in which construction of a vessel’s engines were completed.
1917
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Hamburg
Physical extent of a record.
1