Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
27/03/1903
The year in which a vessel’s construction is completed.
1903
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Murdoch & Murray
Unique identifier for a given ship, it is assigned by a builder.
191
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Steel Steamer
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
Y
The date of last visit by a surveyor.
26/03/1903
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Mersey Docks & Harbour Board
Name of the individual/entity/organisation responsible for authoring the record
James Craig
Name of surveyor.
James Craig
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1, Steel; Lloyds A&C
Recorded information related to a vessel’s movements.
Port Glasgow; Liverpool
Physical arrangement of a ship’s masts, sails and rigging.
Sr - Schooner
Predominant material(s) utilised in a vessel’s construction.
Steel
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
344
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Contextual information related to the reasons of the vessel’s loss or disposal.
Sold for Breaking Up
Physical extent of a record.
2
Name of ship as recorded on the record
Vigilant
The process of transferring a vessel to water, but not necessarily her completion.
12/02/1903
Name of the shipbuilder as it appears on the record.
Murdoch & Murray
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
13576
The listed port to which a given vessel belongs.
Liverpool
The date of first visit by a surveyor.
20/09/1902
The individual and/or organisation listed
Mersey Docks & Harbour Board
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W Davies
Location where the document is written.
Greenock
Location where a vessel’s survey was undertaken.
Port Glasgow
Date of the meeting of the Classing Committee.
30/03/1903
The name of the port/place of destination given.
Liverpool
A vessel’s means of propulsion.
Steam
Is the steamer assisted by sail?
No
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
The official record pronounced by the Committee
To be broken up
Vessel’s place of loss or disposal/last known recorded location.
Dublin
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.