Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/05/1965
The year in which a vessel’s construction is completed.
1949
Unique identifier for a given ship, it is assigned by a builder.
1413
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Letter
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Location where the document is written.
Goa
The name of the port/place of destination given.
Wakayama, North Port, Japan
Predominant material(s) utilised in a vessel’s construction.
Steel
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Hakubasan Maru
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Mitsui Ship Building & Engineering Co Ltd
The country in which the vessel’s construction took place, at the time of writing.
Japan
Additional numbers that feature on a given record that may be used for identification.
A/LL/23-65
Name of the individual/entity/organisation responsible for authoring the record
A S V de Melo
Recorded information related to a vessel’s movements.
Wakayama, North Port
Broad categories and subdivisions of vessels related to their purpose or function.
Passenger cargo
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Gives particular mention to loss and recovery of starboard anchor with 1.5 shackles of the adjoining cable, and that renewal of cable will take place at Wakayama, Japan where she is due to arrive
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.