Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1844 ( Survey Report for Zephyr, August 1844 1844 )
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
Name of surveyor.
Thomas Boyes Simey ( Survey Report for Zephyr, August 1844 1844 )
James Martin; Nathaniel Middleton ( Report of Survey for Repairs for Zephyr, 18th December 1851 1851 )
Peter Courtenay ( Annual Surveys Report for Zephyr, 16th November 1852 1852 )
Thomas Alexander ( Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
A1 For 9 Years ( Survey Report for Zephyr, August 1844 1844 )
9A1; Record Repair ( Report of Survey for Repairs for Zephyr, 18th December 1851 1851 )
9A1 ( Annual Surveys Report for Zephyr, 16th November 1852 1852 )
Cont A1for 3 Years from 1853; Record Repair ( Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
The name of the port/place of destination given.
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
247 ( Survey Report for Zephyr, August 1844 1844, Report of Survey for Repairs for Zephyr, 18th December 1851 1851 )
272 ( Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey Report for Zephyr, August 1844 1844, Report of Survey for Repairs for Zephyr, 18th December 1851 1851, Annual Surveys Report for Zephyr, 16th November 1852 1852, Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
A vessel’s calculated maximum speed.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
The year in which a vessel’s construction is completed.
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
G W & W J Hall ( Survey Report for Zephyr, August 1844 1844 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Davison & Co ( Survey Report for Zephyr, August 1844 1844 )
Scrutton & Sons ( Report of Survey for Repairs for Zephyr, 18th December 1851 1851 )
Scratton ( Annual Surveys Report for Zephyr, 16th November 1852 1852 )
Scrutton Son & Co ( Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
Location where a vessel’s survey was undertaken.
Recorded information related to a vessel’s movements.
Sunderland; West Indies ( Survey Report for Zephyr, August 1844 1844 )
London; West Indies ( Report of Survey for Repairs for Zephyr, 18th December 1851 1851, Annual Surveys Report for Zephyr, 16th November 1852 1852, Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Survey Report for Zephyr, August 1844 1844 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
272 ( Survey Report for Zephyr, August 1844 1844, Report of Survey for Repairs for Zephyr, 18th December 1851 1851 )
247 ( Report of Survey for Repairs for Zephyr, 16th November 1854 1854 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
247 ( Annual Surveys Report for Zephyr, 16th November 1852 1852 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.