Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Yolac ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920 )
Alsacien ( Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Alleghany ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo regarding classification for Alleghany, 5th February 1924 1924 )
Alleghanny ( Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922 )
Arabiana ( Steel Steamer Report for Arabiana, 23rd August 1922 1922 )
Castillian Prince ( Memo for Castillian Prince, 1st February 1924 1924 )
Sicilian Prince ( Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946 )
The process of transferring a vessel to water, but not necessarily her completion.
29/12/1921 ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Unique identifier for a given ship, it is assigned by a builder.
28 ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Location where a vessel’s survey was undertaken.
Haverton Hill on Tees ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922 )
Middlesbrough ( Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922 )
Haverton Hill on Tees; Middlesbrough ( Steel Steamer Report for Arabiana, 23rd August 1922 1922 )
Liverpool ( Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922 )
West Hartlepool; Hartlepool ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
Alexandria ( Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945 )
London ( Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Paris ( Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Does the vessel possess an auxiliary power source?
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Is electric lighting fitted to the vessel?
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Mdb ( Steel Steamer Report for Arabiana, 23rd August 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922 )
Hpl ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
Alx ( Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945 )
Lon ( Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
The individual and/or organisation listed
Furness Withy & Co Ltd ( Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922 )
Prince Line Ltd ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
Rio Cape Line Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945 )
Cie Des Bateaux A Vapeur Du Nord ( Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Recorded information related to a vessel’s movements.
Haverton Hill on Tees; United States America ( Steel Steamer Report for Arabiana, 23rd August 1922 1922 )
Physical arrangement of a ship’s masts, sails and rigging.
Recorded information relating the specific cargo being conveyed.
The port in which a vessel is registered or permanently based.
Liverpool ( Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922 )
London ( Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Surface Condensing ( Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922 )
Triple Expansion ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1922 ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Furness Shipbuilding Co Ltd ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
The port or place in which the vessel’s construction took place, at the time of writing.
Haverton Hill on Tees ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
A vessel’s means of propulsion.
Steam ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
undefined ( Memo for Castillian Prince, 1st February 1924 1924, Memo for Sicilian Prince, 4th January 1946 1946, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947 )
Is the steamer assisted by sail?
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Is machinery fitted at the aft of the vessel?
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Rudder & Stern Frame for Yolac, 8th June 1920 1920, Profile & Deck Plan for Alsacien, 11th September 1922 1922, Midship Section Plan for Alsacien, 18th September 1922 1922, Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Alleghany, 25th August 1922 1922, Freeboard Verification Form for Steamers for Alleghanny, 6th July 1922 1922, Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Memo regarding classification for Alleghany, 29th August 1922 1922, Report on Machinery for Alleghany, 23rd May 1922 1922, Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922, Memo for Castillian Prince, 1st February 1924 1924, Memo regarding classification for Alleghany, 5th February 1924 1924, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 29th January 1946 1946, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Letter from J Moore, for Rio Cape Line Ltd, to Lloyd\'s Register of Shipping, London, regarding Sicilian Prince, 24th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to The Rio Cape Line Ltd, London, regarding Sicilian Prince, 23rd January 1946 1946, Memo for Sicilian Prince, 4th January 1946 1946, Copy of Letter from Clerk to the Classification Committee, to J Taxil Esq, Paris, regarding Alsacien, 2nd June 1947 1947, Memo to the Chief Ship Surveyor regarding Alsacien, 6th May 1947 1947, Letter from J Taxil, to The Secretary, London, regarding Alsacien, 12th April 1947 1947, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
The listed port to which a given vessel belongs.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Shelter Dk with Fbd; Lloyd A & CP; Cargo Battens not Fitted in Shelter; Tween Dks; Carry Oil Fuel FP above 150 F in Deep Tank Aft; +LMB 8,22; FD; CL ( Steel Steamer Report for Arabiana, 23rd August 1922 1922 )
+LMB 8,22; CL; FD ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
Elec Light ( Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922 )
+100A1; Shelter Deck with freeboard 6-45; Examined 12-44; SS Mch No 3-10,34; SS Ant No 1-38; Fitted for Oil Fuel; 8-22 FP above 150 F; Carrying Oil Fuel FP above 150 F in Deep Tank Aft; +LMC MS 5-38; BS 11-44;TS 5-45 CL ; TO Closed; 91 (WE) ( Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945 )
(. . .) ( Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
The name of the port/place of destination given.
United States America ( Steel Steamer Report for Arabiana, 23rd August 1922 1922 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
3489 ( Steel Steamer Report for Arabiana, 23rd August 1922 1922, Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922, Copy of Certificate of Survey of Part Starboard Boiler & Machinery for Sicilian Prince, 13th November 1945 1945, Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945, Form of Postponed Surveys for Sicilian Prince, 25th January 1946 1946, Report of Survey for Repairs, &c for Alsacien, April 1947 1947 )
3496 ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
KMPB ( Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Robert Sargeant ( Form for Vessels of 100 Tons & Upwards for Alleghany, 25th July 1922 1922 )
Furness Withy & Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Sicilian Prince, 16th November 1945 1945 )
Location of construction for a vessel’s engines.
Name of surveyor.
William Cowie; William Morrison ( Report on Machinery for Alleghany, 23rd May 1922 1922 )
William Morrison; William Cowie ( Report on Electric Lighting Installation for Alleghany, 9th August 1922 1922 )