Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Yews ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The process of transferring a vessel to water, but not necessarily her completion.
10/11/1905 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Unique identifier for a given ship, it is assigned by a builder.
186 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Screw Steamer ( Steel Steamer Report for Yews, 18th December 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Does the vessel possess an auxiliary power source?
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Is electric lighting fitted to the vessel?
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
A vessel’s calculated maximum speed.
1905 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905 )
1909 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
909 ( Report of Survey for Repairs, &c for Yews, 29th July 1909 1909 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for Yews, 18th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905 )
Dub ( Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The individual and/or organisation listed
Frontier Town Steam Ship Co Ltd ( Steel Steamer Report for Yews, 18th December 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
A Atkinson ( Steel Steamer Report for Yews, 18th December 1905 1905 )
W McFerran ( Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 Steel; Lloyd\'s A & CP; (Well Deck) ( Steel Steamer Report for Yews, 18th December 1905 1905 )
+LMC 12,05 ( Report on Machinery for Yews, 12th December 1905 1905 )
+100A1; SS No 1,09; +LMC 7,09 ( Report of Survey for Repairs, &c for Yews, 29th July 1909 1909 )
+LMC 7,09 ( Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The name of the port/place of destination given.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
333 ( Steel Steamer Report for Yews, 18th December 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The port in which a vessel is registered or permanently based.
Date in which construction of a vessel’s engines were completed.
The year in which a vessel’s construction is completed.
1905 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
John Fullerton & Co ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The port or place in which the vessel’s construction took place, at the time of writing.
Paisley ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
A vessel’s means of propulsion.
Steam ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Is the steamer assisted by sail?
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Is machinery fitted at the aft of the vessel?
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905, Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
1905 ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for Yews, 19th December 1905 1905, Steel Steamer Report for Yews, 18th December 1905 1905, Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905 )
1909 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding SS No 1 & Damage of Yews, 30th July 1909 1909, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909, Ship Forgings Form for Yews, 13th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
The listed port to which a given vessel belongs.
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Joseph Fisher & Sons ( Steel Steamer Report for Yews, 18th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Frank Fisher ( Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905 )
Location where a vessel’s survey was undertaken.
Paisley; Glasgow ( Steel Steamer Report for Yews, 18th December 1905 1905 )
Glasgow ( Engine Forgings Form for Yews, 30th June 1905 1905, Ship Forgings Form for Yews, 13th July 1909 1909 )
Newry ( Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905 )
Irvine; Paisley; Glasgow ( Report on Machinery for Yews, 12th December 1905 1905 )
Paisley ( Profile & Deck Plan for Yews, 23rd March 1905 1905, Plan of Marine Boiler for Yews, 1905 1905, Half Midship Section Plan for Yews, 23rd March 1905 1905 )
Dublin ( Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Certificate of Survey of Damage & Repairs for Yews, 28th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
North Wall, Dublin ( Sketch of Fracture & Veed Welds in Sternframe for Yews, 16th July 1909 1909 )
Recorded information related to a vessel’s movements.
Paisley; Coasting ( Steel Steamer Report for Yews, 18th December 1905 1905 )
Dublin; Coasting ( Report of Survey for Repairs, &c for Yews, 29th July 1909 1909, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Physical arrangement of a ship’s masts, sails and rigging.
Location of construction for a vessel’s engines.
Irvine ( Engine Forgings Form for Yews, 30th June 1905 1905, Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905, Report on Machinery for Yews, 12th December 1905 1905, Report of Survey for Repairs, &c, of Engines & Boilers for Yews, 29th July 1909 1909 )
Type and configuration of the engine(s) supplied for a vessel.
Compound Surface Condensing Vertical Inverted ( Form for Vessels of 100 Tons & Upwards for Yews, 13th December 1905 1905 )
Compound Surface condensing ( Report on Machinery for Yews, 12th December 1905 1905 )
Name of surveyor.
George Murdoch ( Report on Machinery for Yews, 12th December 1905 1905 )
Alexander Fletcher ( Ship Forgings Form for Yews, 13th July 1909 1909 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.