Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
Name of surveyor.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Restored A1 for 8 Years ( Survey Report for Wellington, 29th August 1866 1866 )
Restd 8A1 ( Annual Surveys Report for Wellington, 5th June 1867 1867 )
Restd 66.8A1 ( Report of Survey for Repairs for Wellington, 18th April 1868 1868 )
Rest 8A1; HT 71; Record YM ( Report of Survey for Repairs for Wellington, 25th July 1871 1871 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The name of the port/place of destination given.
Magadore ( Annual Surveys Report for Wellington, 5th June 1867 1867 )
Gibraltar ( Report of Survey for Repairs for Wellington, 18th April 1868 1868 )
Newfoundland ( Report of Survey for Repairs for Wellington, 25th July 1871 1871 )
The year in which a vessel’s construction is completed.
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
Broad categories and subdivisions of vessels related to their purpose or function.
A vessel’s means of propulsion.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Survey Report for Wellington, 29th August 1866 1866, Annual Surveys Report for Wellington, 5th June 1867 1867, Report of Survey for Repairs for Wellington, 18th April 1868 1868, Report of Survey for Repairs for Wellington, 25th July 1871 1871 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Recorded information related to a vessel’s movements.
London; Magadore ( Annual Surveys Report for Wellington, 5th June 1867 1867 )
London; Gibraltar ( Report of Survey for Repairs for Wellington, 18th April 1868 1868 )
London; Newfoundland ( Report of Survey for Repairs for Wellington, 25th July 1871 1871 )
A vessel’s calculated maximum speed.
1867 ( Annual Surveys Report for Wellington, 5th June 1867 1867 )
1871 ( Report of Survey for Repairs for Wellington, 25th July 1871 1871 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.