Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Comrie Castle ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903 )
Cluny Castle ( Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903 )
Umvoti ( Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
05/10/1903 ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
442 ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Location where a vessel’s survey was undertaken.
Clydebank ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902 )
Glasgow ( Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903 )
London ( Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940 )
Newcastle ( Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Contextual information related to the reasons of the vessel’s loss or disposal.
Sunk as a blockship ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903 )
Lon ( Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940 )
The individual and/or organisation listed
The Union Castle Mail Steam Ship Co Ltd ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903 )
Union Castle Mail Steamship Co Ltd ( Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903 )
Donald Currie & Co ( Report on Machinery for Comrie Castle, 11th November 1903 1903 )
Bullard King & Co Ltd ( Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Hanry Prior Lowcay ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903 )
Henry Prior Lowcay ( Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 (Steel); Lloyd's A & CP ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903 )
+LMC 11,03 ( Report on Machinery for Comrie Castle, 11th November 1903 1903 )
+100A1; 11,39 S S NWC 2nd No 3-7,29; S S Mdb No 2-38; +LMC 7,38; B S 7,39; CL 6,38 ( Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912 )
+100A1; Subject ( Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940 )
+100A1 6,40; S S Nwc 2nd No 3-7,29; S S Mdb No 2-38; +LMC 7,38; B S 7,39; TS 6,38 CL ( Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5167 ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903 )
5183 ( Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Type and configuration of the engine(s) supplied for a vessel.
Triple Expansion Direct Acting Vertical Inverted Cylinders ( Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903 )
Twin Screw Triple ( Report on Machinery for Comrie Castle, 11th November 1903 1903 )
Date in which construction of a vessel’s engines were completed.
Recorded information related to a vessel’s movements.
Walvis Bay; Freetown ( Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
The year in which a vessel’s construction is completed.
1903 ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Barclay, Curle & Co ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
undefined ( Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940 )
Is the steamer assisted by sail?
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Recorded date for the vessel’s loss or disposal.
29/07/1940 ( Plan of Main Boilers for Comrie Castle, 3rd November 1902 1902, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding classification for Comrie Castle, 24th November 1903 1903, Letter from Anderson Maclean, Director Manager of Shipbuilding at Barclay, Curle & Co Ltd, to the Glasgow Surveyors, enclosing a letter concerning tank ceiling for Comrie Castle, 5th September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to the Glasgow Surveyors regarding tank top ceiling for Cluny Castle, filed with documents for Comrie Castle, 3rd September 1903 1903, Letter from George Scott, for London Shipowners Donald Currie & Co, to Lloyd's Register London regarding cement in the double bottom of Cluny Castle, filed with documents for Comrie Castle, 6th May 1903 1903, Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Letter from R W Hyton, pro Secretary Glasgow, to A G Dryhurst, Secretary for Lloyd's Register London, forwarding forging reports & plan of main boilers for Comrie Castle, 3rd December 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Cover note for first entry report sent to Newcastle for Umvoti, 31st May 1929 1929, Memo from the Chief Ship Surveyor to the Classing Committee regarding class subject to indented plating of Umvoti, 20th June 1940 1940, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940, Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
The listed port to which a given vessel belongs.
London ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903, Report of Survey for Repairs, &c, of Engines & Boilers for Umvoti, 1st June 1912 1912, Report of Survey for Repairs, &c for Umvoti, 1st June 1940 1940 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
Donald Currie & Co ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903, Report on Machinery for Comrie Castle, 11th November 1903 1903 )
Sir Donald Currie; Sir Francis Evans ( Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903 )
Name of surveyor.
E C Champness ( Iron or Steel Steamer Report for Comrie Castle, 13th November 1903 1903 )
Physical arrangement of a ship’s masts, sails and rigging.
Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).
VHBP ( Form for Vessels of 100 Tons & Upwards for Comrie Castle, 26th October 1903 1903 )
Location of construction for a vessel’s engines.
The name of the port/place from which a vessel’s voyage originated.
Walvis Bay ( Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
The name of the port/place of destination given.
Freetown ( Report of Total Loss, Casualty, &c for Umvoti, Undated no date )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.