Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

The year in which a vessel’s construction is completed.

Year of ship completion

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Additional numbers that feature on a given record that may be used for identification.

Other numbers document know by

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

The date of last visit by a surveyor.

Date of latest survey

Location where the document is written.

Location of Document Creation

A vessel’s means of propulsion.

Propulsion

Is the steamer assisted by sail?

Sail assisted steamer

Is machinery fitted at the aft of the vessel?

Machinery aft?

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

Pertinent, useful or interesting recorded content.

Notes - interesting informations

Name of ship as recorded on the record

Ship name

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

Unique identifier for a given ship, it is assigned by a builder.

Yard no

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Other/additional record(s) specifically mentioned, referenced or associated to another record.

Associated documents

The date of first visit by a surveyor.

Date of first survey

Name of the individual/entity/organisation responsible for authoring the record

Document author

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

Does the vessel possess an auxiliary power source?

Auxillary

Is electric lighting fitted to the vessel?

Electric light fitted?

Physical extent of a record.

Number of parts

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.