Name of ship as recorded on the record
Satellite ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
19/04/1886 ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
180 ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Location where a vessel’s survey was undertaken.
Port Glasgow ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886 )
Mossend ( Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886 )
Glasgow ( Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886 )
Leeds; Greenock ( Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886 )
Mossend; Glasgow ( Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886 )
Greenock ( Steel Ship Report for Satellite, 10th May 1886 1886 )
Port Glasgow; Greenock ( Report on Machinery for Satellite, 12th May 1886 1886 )
Sunderland ( Ship Forgings Form for Satellite, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
undefined ( Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886 )
Is the steamer assisted by sail?
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Location of construction for a vessel’s engines.
Port Glasgow ( Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886 )
The listed port to which a given vessel belongs.
London ( Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; 1 Steel; +LMC; LA & CP ( Steel Ship Report for Satellite, 10th May 1886 1886 )
+LMC ( Report on Machinery for Satellite, 12th May 1886 1886 )
The name of the port/place of destination given.
London ( Steel Ship Report for Satellite, 10th May 1886 1886 )
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Direct Triple Expansion ( C Cylinders) ( Report on Machinery for Satellite, 12th May 1886 1886 )
The year in which a vessel’s construction is completed.
1886 ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
D J Dunlop & Co ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Greenock ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
Twin Screw Steamer ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886 )
undefined ( Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Longitudinal for Satellite, 27th November 1885 1885, Plan of Boiler for Satellite, 10th December 1885 1885, Midship Section Plan for Satellite, 27th November 1885 1885, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Plan of Pumping Arrangement for Satellite, 4th March 1886 1886, Tests of Boiler Steel undertaken by Henry Hand, for plates manufactured by The Steel Co of Scotland of Blochairn for Satellite, 24th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Engine Forgings or Castings Form for Satellite, 20th March 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886, Press Copy of Steel Test Certificate for Tests on Satellite, 23rd February 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886, Form of Particulars for Record of Material of Boilers for Satellite, 17th May 1886 1886, Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886, Ship Forgings Form for Satellite, Undated no date )
Name of surveyor.
Joseph Thomson ( Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 28th December 1885 1885, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 4th February 1886 1886, Tests of Boiler Steel undertaken by Joseph Thomson, for plates manufactured by Clydesdale Iron & Steel Co of Mossend for Satellite, 21st January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 16th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 8th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 13th January 1886 1886, Receipt for Steel manufactured by Clydesdale Iron & Steel Co for Satellite, 29th January 1886 1886 )
James Innes ( Tests of Boiler Steel undertaken by James Innes, for plates manufactured by The Leeds Forge Co Ltd of Leeds for, Satellite, 18th January 1886 1886, Receipt for Steel manufactured by The Leeds Forge Co Ltd for Satellite, 16th January 1886 1886 )
George Newcomb; Walter E Robson ( Engine Forgings or Castings Form for Satellite, 20th March 1886 1886 )
John Dawkins ( Steel Ship Report for Satellite, 10th May 1886 1886 )
Hugh Cameron ( Ship Forgings Form for Satellite, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk ( Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886 )
The individual and/or organisation listed
The Honourable Corp of Trinity House ( Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886 )
Recorded information related to a vessel’s movements.
Greenock; London ( Steel Ship Report for Satellite, 10th May 1886 1886 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
242 ( Steel Ship Report for Satellite, 10th May 1886 1886, Report on Machinery for Satellite, 12th May 1886 1886 )
Date in which construction of a vessel’s engines were completed.
1886 ( Report on Machinery for Satellite, 12th May 1886 1886 )