Name of ship as recorded on the record
No 350 ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
25/05/1906 ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
350 ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Location where a vessel’s survey was undertaken.
Paisley ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905 )
Paisley; Glasgow ( Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906 )
Timaru ( Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931 )
Dunedin ( Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931 )
London ( Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Is electric lighting fitted to the vessel?
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Gls ( Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906 )
Lon ( Report of Survey for Repairs, &c for No 350, Undated no date )
The individual and/or organisation listed
Recorded information related to a vessel’s movements.
Paisley; Timaru ( Steel Steamer Report for No 350, 21st July 1906 1906 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Location of construction for a vessel’s engines.
Paisley ( Report on Machinery for Dredger, No 350, 12th July 1906 1906 )
The year in which a vessel’s construction is completed.
1906 ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Fleming & Ferguson Ltd ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Paisley ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
A vessel’s means of propulsion.
Steam ( Steelwork Plan for No 350, 1st November 1905 1905, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931 )
undefined ( Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Is the steamer assisted by sail?
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Steelwork Plan for No 350, 1st November 1905 1905, Half Midship Section Plan for No 350, 1st November 1905 1905, Plan of Return Tube Boiler for No 350, 11th September 1905 1905, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding First Entry for No 350, 24th July 1906 1906, Letter from R N Ayton, pro Secretary, Lloyd\'s Register, Glasgow, to Andrew Scott Esq, London, regarding No 350, 24th July 1906 1906, Steel Steamer Report for No 350, 21st July 1906 1906, Report on Machinery for Dredger, No 350, 12th July 1906 1906, Letter from F A Ason, Secretary, to The Surveyor, Lloyd's Register of Shipping, Dunedin, regarding No 350, 6th October 1930 1930, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 26th November 1930 1930, Letter from W J Crawford, Surveyor to Lloyd\'s Register, Dunedin, to A Scott Esq, Secretary to Lloyd\'s Register, London, regarding No 350, 9th October 1930 1930, Copy of Letter from pro Secretary, Lloyd\'s Register, London, to The Secretary, Timaru Harbour Board Office, Timaru, regarding No 350, 26th March 1931 1931, Memo regarding classification of No 350, 26th March 1931 1931, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding No 350, 16th March 1931 1931, Letter from W J Crawford, Surveyor to Lloyd's Register, to A Scott Esq, Secretary to Lloyd's Register, London, regarding No 350, 28th January 1931 1931, Letter from F A Ason, Secretary, to W J Crawford, Surveyor to Lloyd's Register, Dunedin, regarding No 350, 24th January 1931 1931, Report of Survey for Repairs, &c for No 350, Undated no date )
The listed port to which a given vessel belongs.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+A1 (Steel); Hopper Dredger; Lloyd's A&C P ( Steel Steamer Report for No 350, 21st July 1906 1906 )
+LMC 7,06 ( Report on Machinery for Dredger, No 350, 12th July 1906 1906 )
Withdraw Class & Insert (...) ( Report of Survey for Repairs, &c for No 350, Undated no date )
The name of the port/place of destination given.
Timaru ( Steel Steamer Report for No 350, 21st July 1906 1906 )
Type and configuration of the engine(s) supplied for a vessel.
Twin Screw Triple Expansion ( Report on Machinery for Dredger, No 350, 12th July 1906 1906 )
Date in which construction of a vessel’s engines were completed.
1906 ( Report on Machinery for Dredger, No 350, 12th July 1906 1906 )