Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The port or place in which the vessel’s construction took place, at the time of writing.
Newcastle ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
The listed port to which a given vessel belongs.
London ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
London ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
Wood ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
399 ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
The year in which a vessel’s construction is completed.
1808 ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
The individual and/or organisation listed
M Foster ( Annual Surveys Report for Nautitus, 12th November 1839 1839 )
Unknown ( Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Name of surveyor.
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
E1 ( Annual Surveys Report for Nautitus, 12th November 1839 1839 )
Raised to E1 ( Annual Surveys Report for Nautitus, 20th November 1839 1839 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Annual Surveys Report for Nautitus, 12th November 1839 1839, Annual Surveys Report for Nautitus, 20th November 1839 1839 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.