Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lon ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
The individual and/or organisation listed
Temperley & Co ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856 )
Temperley ( Annual Surveys Report for Halifax, 5th April 1858 1858 )
Name of surveyor.
Bernard Waymouth; John F Light ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856 )
John F Light ( Annual Surveys Report for Halifax, 5th April 1858 1858 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
AE1 Asterisk; Record Repair ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856 )
AE1 ( Annual Surveys Report for Halifax, 5th April 1858 1858 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.
151 ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
The name of the port/place of destination given.
Riga ( Annual Surveys Report for Halifax, 5th April 1858 1858 )
The year in which a vessel’s construction is completed.
1803 ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
The port or place in which the vessel’s construction took place, at the time of writing.
The listed port to which a given vessel belongs.
London ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Location where a vessel’s survey was undertaken.
London ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
Physical arrangement of a ship’s masts, sails and rigging.
Predominant material(s) utilised in a vessel’s construction.
Wood ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.
149 ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Report of Survey for Repairs for Halifax, 23rd June 1856 1856, Annual Surveys Report for Halifax, 5th April 1858 1858 )
Recorded information related to a vessel’s movements.
London; Riga ( Annual Surveys Report for Halifax, 5th April 1858 1858 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
151 ( Annual Surveys Report for Halifax, 5th April 1858 1858 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.