Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

+100A1 Steel pt Awning dk with freeboard S 9,2 1/2; A & CP; +LMC 2,93 ( Steel Steamer Report for Empress, 7th February 1893 1893 )

+LMC 2,93 ( Report on Machinery for Empress, 8th February 1893 1893 )

The name of the port/place of destination given.

Destined voyage

Cardiff; Cape Town ( Steel Steamer Report for Empress, 7th February 1893 1893 )

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Triple Expansion 3 Cranks ( Report on Machinery for Empress, 8th February 1893 1893 )

Date in which construction of a vessel’s engines were completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

The port or place in which the vessel’s construction took place, at the time of writing.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Recorded information related to a vessel’s movements.

Voyage information

West Hartlepool; Cardiff; Cape Town ( Steel Steamer Report for Empress, 7th February 1893 1893 )

Physical arrangement of a ship’s masts, sails and rigging.

The listed port to which a given vessel belongs.

Port belonging to

West Hartlepool ( Report on Machinery for Empress, 8th February 1893 1893 )

Location of construction for a vessel’s engines.

Location of engine build

Hartlepool ( Report on Machinery for Empress, 8th February 1893 1893 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.