Davanger ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
29/11/1921 ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
383 ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Location where a vessel’s survey was undertaken.
Greenock ( Plan of Boilers for Davanger, 14th February 1921 1921, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922 )
Port Glasgow; Greenock ( Steel Steamer Report for Davanger, 31st January 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922 )
Port Glasgow ( Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922 )
Wokingham; Bergen ( Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940 )
London ( Report of Survey for Repairs, &c for Davanger, Undated no date )
A vessel’s means of propulsion.
Steam ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
undefined ( Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940 )
Is the steamer assisted by sail?
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
1921 ( Plan of Boilers for Davanger, 14th February 1921 1921 )
1922 ( Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922 )
1940 ( Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940 )
0000 ( Report of Survey for Repairs, &c for Davanger, Undated no date )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Grk ( Steel Steamer Report for Davanger, 31st January 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922 )
Lon ( Report of Survey for Repairs, &c for Davanger, Undated no date )
The individual and/or organisation listed
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1 1,22; Carrying Petroleum in Bulk; Longitudinal Framing; Lloyd\'s A & CP; +LMC 1,22; FD; Fitted for Oil Fuel 1,22; FP Above 150 F ( Steel Steamer Report for Davanger, 31st January 1922 1922 )
+LMC 1,22; FD; Fitted for Oil Fuel 1,22; FP Above 150 F ( Report on Machinery for Davanger, 23rd January 1922 1922 )
Expunge Class With Red Line ( Report of Survey for Repairs, &c for Davanger, Undated no date )
The name of the port/place of destination given.
Tampico ( Steel Steamer Report for Davanger, 31st January 1922 1922 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
7102 ( Steel Steamer Report for Davanger, 31st January 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Location of construction for a vessel’s engines.
Greenock ( Report on Machinery for Davanger, 23rd January 1922 1922 )
The year in which a vessel’s construction is completed.
1922 ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
William Hamilton & Co Ltd ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
The port or place in which the vessel’s construction took place, at the time of writing.
Port Glasgow ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Screw Steamer ( Steel Steamer Report for Davanger, 31st January 1922 1922 )
Tanker ( Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
Is electric lighting fitted to the vessel?
No ( Plan of Boilers for Davanger, 14th February 1921 1921, Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922, Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922, Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940, Report of Survey for Repairs, &c for Davanger, Undated no date )
A vessel’s calculated maximum speed.
y 1921 ( Plan of Boilers for Davanger, 14th February 1921 1921 )
1922 ( Memo to the Chief Ship Surveyor regarding Davanger, 14th February 1922 1922, Steel Steamer Report for Davanger, 31st January 1922 1922, Letter from F C G Barr, per The Surveyors, to The Secretary, London, regarding Davanger, 11th February 1922 1922, Certificate of Survey of Damage & Repairs for Davanger, 10th February 1922 1922, Report on Machinery for Davanger, 23rd January 1922 1922 )
y 1922 ( Profile & Deck Plan for Davanger, 23rd January 1922 1922, Half Midship Section Plan for Davanger, 23rd January 1922 1922 )
1940 ( Memo regarding classification for Davanger, 4th April 1940 1940, Memo to the Chief Ship Surveyor & Chief Engineer Surveyor regarding Davanger, 28th March 1940 1940, Question & Answer Memo between Wokingham & Bergen Office, regarding Davanger being special survey, 28th February 1940 1940, Translation of Letter from Georg Vedeler, Den Tekniske Avdeling, Westfal-Larsen & Co A/S, to Lloyd\'s Register of Shipping, regarding Davanger, 12th March 1940 1940 )
ated ( Report of Survey for Repairs, &c for Davanger, Undated no date )
Recorded information relating the specific cargo being conveyed.
The listed port to which a given vessel belongs.
Name of surveyor.
Recorded information related to a vessel’s movements.
Port Glasgow; Greenock; Tampico ( Steel Steamer Report for Davanger, 31st January 1922 1922 )
Physical arrangement of a ship’s masts, sails and rigging.
FAS - Fore & Aft Schooner ( Steel Steamer Report for Davanger, 31st January 1922 1922 )
Type and configuration of the engine(s) supplied for a vessel.
Triple Compound ( Report on Machinery for Davanger, 23rd January 1922 1922 )
Date in which construction of a vessel’s engines were completed.
1922 ( Report on Machinery for Davanger, 23rd January 1922 1922 )