Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

Ship name

Clan Macpherson ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

31/08/1905 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Unique identifier for a given ship, it is assigned by a builder.

Yard no

287 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

undefined ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Screw Steamer ( Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917 )

Predominant material(s) utilised in a vessel’s construction.

Material of construction

Steel ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Does the vessel possess an auxiliary power source?

Auxillary

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Is electric lighting fitted to the vessel?

Electric light fitted?

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Location where a vessel’s survey was undertaken.

Location of Survey

Glasgow ( Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917 )

West Hartlepool; Hartlepool ( Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905 )

Newcastle on Tyne ( Report on Boilers for Clan Macpherson, 30th August 1905 1905 )

Hartlepool ( Plan of Boilers for Clan Macpherson, 20th March 1905 1905 )

West Hartlepool ( Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905 )

Belfast ( Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917 )

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Previously referred to as signal letters (c.19th C), radio call signs enable a ship to communicate and are assigned by the International Telecommunications Union (ITU).

The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.

The year in which a vessel’s construction is completed.

Year of ship completion

1905 ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

Furness, Withy & Co Ltd ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

West Hartlepool ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

A vessel’s means of propulsion.

Propulsion

Steam ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

undefined ( Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917 )

Is the steamer assisted by sail?

Sail assisted steamer

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Is machinery fitted at the aft of the vessel?

Machinery aft?

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

No ( Remarks of the Chief Ship Surveyor to the Classing Committee regarding class of Clan Macpherson, 30th November 1905 1905, Letter from Cayzer Irvine & Co, to Lloyds Surveyors, West Hartlepool, regarding Clan Macpherson, 24th November 1905 1905, Steel Steamer Report for Clan Macpherson, 25th November 1905 1905, Report on Machinery for Clan Macpherson, 22nd November 1905 1905, Form for Vessels of 100 Tons & Upwards for Clan Macpherson, 23rd November 1905 1905, Report on Boilers for Clan Macpherson, 30th August 1905 1905, Report on Electric Lighting Installation for Clan Macpherson, 22nd November 1905 1905, Plan of Boilers for Clan Macpherson, 20th March 1905 1905, Deck Plans for Clan MacPherson, 6th June 1905 1905, Profile Plan for Clan MacPherson, 15th March 1905 1905, Profile Plan for Clan Macpherson, 28th November 1905 1905, Half Midship Section Plan for Clan MacPherson, 15th March 1905 1905, Copy of Letter from Secretary to the Glasgow Committee, to Cayzer Irvine & Co Ltd, Glasgow, regarding Clan Macpherson, 16th October 1917 1917, Memo for the Chief Ship Surveyor & Chief Engineer Surveyor with their annotations regarding damage & 1st No 2 survey partly held for Clan Macpherson, 18th October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 13th October 1917 1917, List of Stores destroyed & lost overboard for Clan Macpherson, 24th July 1917 1917, Report of Survey for Repairs, &c for Clan Macpherson, 13th October 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 26th September 1917 1917, Letter from Robert D Beaton, Chief Engineer, regarding Clan Macpherson, 3rd August 1917 1917, Copy of a Letter to P L Warlow Esq, Glasgow, regarding Clan Macpherson, 23rd October 1917 1917, Certificate of Survey of Damage & Repairs for Clan Macpherson, 15th October 1917 1917, Report of Survey for Repairs, &c, of Engines & Boilers for Clan Macpherson, 28th September 1917 1917, Cover note stating documents for a Sister Vessel are with the tracings bag of Clan Macpherson, send to Glasgow 15th August 1923 1923 )

Name of surveyor.

Recorded information related to a vessel’s movements.

Type and configuration of the engine(s) supplied for a vessel.

The name of the port/place from which a vessel’s voyage originated.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.