Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
Cape Breton ( Survey Report for Cape Breton, 4th March 1835 1835 )
The port or place in which the vessel’s construction took place, at the time of writing.
Cape Breton ( Survey Report for Cape Breton, 4th March 1835 1835 )
The listed port to which a given vessel belongs.
Liverpool ( Survey Report for Cape Breton, 4th March 1835 1835 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
Maxwell ( Survey Report for Cape Breton, 4th March 1835 1835 )
Location where a vessel’s survey was undertaken.
Liverpool ( Survey Report for Cape Breton, 4th March 1835 1835 )
Recorded information related to a vessel’s movements.
Liverpool; Cape Good Hope ( Survey Report for Cape Breton, 4th March 1835 1835 )
Physical arrangement of a ship’s masts, sails and rigging.
Bg - Brig ( Survey Report for Cape Breton, 4th March 1835 1835 )
Predominant material(s) utilised in a vessel’s construction.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
The year in which a vessel’s construction is completed.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
R Wise & Co ( Survey Report for Cape Breton, 4th March 1835 1835 )
Name of surveyor.
Robert Hamilton ( Survey Report for Cape Breton, 4th March 1835 1835 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
The name of the port/place of destination given.
Cape Good Hope ( Survey Report for Cape Breton, 4th March 1835 1835 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.