Name of ship as recorded on the record
Bankholme ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
The process of transferring a vessel to water, but not necessarily her completion.
12/10/1889 ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Unique identifier for a given ship, it is assigned by a builder.
117 ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Location where a vessel’s survey was undertaken.
Leith ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889 )
Glasgow ( Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889 )
London ( Query Form for Bankholme, 17th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
Grangemouth ( Profile Plan for Bankholme, 1889 1889 )
Alloa; Grangemouth; Leith ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
Predominant material(s) utilised in a vessel’s construction.
Steel ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Does the vessel possess an auxiliary power source?
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Is electric lighting fitted to the vessel?
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Physical arrangement of a ship’s masts, sails and rigging.
Bk - Barque ( Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
A vessel’s calculated maximum speed.
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Lth ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
Lon ( Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
The individual and/or organisation listed
Bank Shipping Co Ltd ( Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
W Wiseman ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
G W Puxley ( Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
Recorded information related to a vessel’s movements.
Alloa; Grangemouth; London ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
London; Dunedin ( Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1229 ( Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
The year in which a vessel’s construction is completed.
1889 ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Grangemouth Dockyard Co ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Plan of Longitudinal Elevation for Bankholme, Undated no date )
The Grangemouth Dockyard Co ( Profile Plan for Bankholme, 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
The port or place in which the vessel’s construction took place, at the time of writing.
Alloa ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
A vessel’s means of propulsion.
undefined ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Sail ( Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
Is the steamer assisted by sail?
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Is machinery fitted at the aft of the vessel?
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Letter from William Paulsen, Leith Surveyor, to the Secretary of Lloyd's Register forwarding the tracings of Profile, Mid-deck & Rigging Plan for Bankholme, 4th December 1889 1889, Form of Particulars for Record of Moulded Depth in Lloyd's Register for Bankholme, 7th December 1889 1889, Ship Forgings Form for Bankholme, 7th October 1889 1889, Ship Forgings Form for Bankholme, 20th September 1889 1889, Ship Forgings Form for Bankholme, 15th August 1889 1889, Query Form for Bankholme, 17th December 1889 1889, Letter from R Lambert, Pro Leith Surveyor, to J B Taylor Esq, Lloyds Register London, regarding enclosed plan of masts & rigging for Bankholme, 14th December 1889 1889, Profile Plan for Bankholme, 1889 1889, Plan of Midship Section for Bankholme, 13th February 1889 1889, Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890, Plan of Longitudinal Elevation for Bankholme, Undated no date )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Profile Plan for Bankholme, 1889 1889 )
The listed port to which a given vessel belongs.
Liverpool ( Steel Ship Report for Bankholme, 11th December 1889 1889, Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
The individual and/or organisation listed that is responsible for the everyday management of a ship. This may be the same as the owner.
W Just & Co ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
+100A1; Steel 2 Dks; A & CP ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
Record Freeboard ( Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
The name of the port/place of destination given.
London ( Steel Ship Report for Bankholme, 11th December 1889 1889 )
Dunedin ( Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )
Name of surveyor.
Henri Wilkinson ( Report of Survey for Repairs, &c for Bankholme, 15th January 1890 1890 )