Ship
Ship
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

The port or place in which the vessel’s construction took place, at the time of writing.

The listed port to which a given vessel belongs.

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

A1 for 9 Years; A & CP ( Survey Report for Annie, 8th May 1863 1863 )

The name of the port/place of destination given.

Destined voyage

Jersey; Tampico ( Survey Report for Annie, 8th May 1863 1863 )

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Location of construction for a vessel’s engines.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

The individual and/or organisation listed

Location where a vessel’s survey was undertaken.

Recorded information related to a vessel’s movements.

Voyage information

St Aubins Road; Jersey; Tampico ( Survey Report for Annie, 8th May 1863 1863 )

Physical arrangement of a ship’s masts, sails and rigging.

Predominant material(s) utilised in a vessel’s construction.

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Gross Register Tonnage (NM)

91 ( Survey Report for Annie, 8th May 1863 1863 )

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Inverted Compound Surface Condensing ( Engineer Surveyor's Report on Machinery for Annie, 30th January 1879 1879 )

Date in which construction of a vessel’s engines were completed.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.