Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1849 ( Survey Report for Annie, 14th July 1849 1849 )
The port or place in which the vessel’s construction took place, at the time of writing.
Sunderland ( Survey Report for Annie, 14th July 1849 1849 )
The listed port to which a given vessel belongs.
Sunderland ( Survey Report for Annie, 14th July 1849 1849 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
J Watson ( Survey Report for Annie, 14th July 1849 1849 )
Location where a vessel’s survey was undertaken.
Sunderland ( Survey Report for Annie, 14th July 1849 1849 )
Recorded information related to a vessel’s movements.
Sunderland; Cronstadt ( Survey Report for Annie, 14th July 1849 1849 )
Broad categories and subdivisions of vessels related to their purpose or function.
undefined ( Survey Report for Annie, 14th July 1849 1849 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
The year in which a vessel’s construction is completed.
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Todd & Brown ( Survey Report for Annie, 14th July 1849 1849 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
The individual and/or organisation listed
W Carling ( Survey Report for Annie, 14th July 1849 1849 )
Name of surveyor.
Thomas Boyes Simey ( Survey Report for Annie, 14th July 1849 1849 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
The name of the port/place of destination given.
Cronstadt ( Survey Report for Annie, 14th July 1849 1849 )
Physical arrangement of a ship’s masts, sails and rigging.
Sw - Snow ( Survey Report for Annie, 14th July 1849 1849 )
Predominant material(s) utilised in a vessel’s construction.
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.