Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Name of ship as recorded on the record

The process of transferring a vessel to water, but not necessarily her completion.

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Lon ( Survey Report for Agnes Germyn, 14th August 1844 1844 )

An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.

Location where a vessel’s survey was undertaken.

Recorded information related to a vessel’s movements.

Voyage information

London; Dantzic ( Survey Report for Agnes Germyn, 14th August 1844 1844 )

Physical arrangement of a ship’s masts, sails and rigging.

Predominant material(s) utilised in a vessel’s construction.

System of admeasurement referred to as ‘Builder’s Old Measurement’ (BM or BOM) in place between 1786 and 1836.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

No ( Survey Report for Agnes Germyn, 14th August 1844 1844 )

Does the vessel possess an auxiliary power source?

Is electric lighting fitted to the vessel?

The year in which a vessel’s construction is completed.

The port or place in which the vessel’s construction took place, at the time of writing.

The individual and/or organisation listed

Name of surveyor.

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

The name of the port/place of destination given.

A vessel’s means of propulsion.

Is the steamer assisted by sail?

System of measurement that replaced ‘Builder’s Old Measurement’, taking a vessel’s internal capacity as the standard. Vessels built between 1836 and 1854 were legally required to display both tonnages.

Is machinery fitted at the aft of the vessel?

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.