Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

The process of transferring a vessel to water, but not necessarily her completion.

The port or place in which the vessel’s construction took place, at the time of writing.

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Is electric lighting fitted to the vessel?

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Grk ( Report on Machinery for Aberdare, 3rd May 1901 1901 )

The individual and/or organisation listed

Type and configuration of the engine(s) supplied for a vessel.

Engine type

Compound Inverted Direct Acting ( Report on Machinery for Aberdare, 3rd May 1901 1901 )

Date in which construction of a vessel’s engines were completed.

The year in which a vessel’s construction is completed.

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Location where a vessel’s survey was undertaken.

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

The listed port to which a given vessel belongs.

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Location of construction for a vessel’s engines.

Location of engine build

Port Glasgow ( Report on Machinery for Aberdare, 3rd May 1901 1901 )

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.