Ship
Ship
  • Related documents Related
  • Complete documents list Documents
  • Report ship? Report?
?

Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.

Date recorded as the time of writing.

Date of document

The year in which a vessel’s construction is completed.

Year of ship completion

The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.

Shipbuilder

The port or place in which the vessel’s construction took place, at the time of writing.

Place of build

Unique internal numbers used for identifying, referring and retrieving a specific survey report.

Survey number

The listed port to which a given vessel belongs.

Port belonging to

The date of first visit by a surveyor.

Date of first survey

The individual and/or organisation listed

Ship owner

Location where the document is written.

Location of Document Creation

Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.

Classification

Recorded information related to a vessel’s movements.

Voyage information

Broad categories and subdivisions of vessels related to their purpose or function.

Ship type

A vessel’s means of propulsion.

Propulsion

Is the steamer assisted by sail?

Sail assisted steamer

Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.

Refrigeration machinery fitted for cargo purposes?

Does the vessel possess an auxiliary power source?

Auxillary

Is electric lighting fitted to the vessel?

Electric light fitted?

A vessel’s calculated maximum speed.

Speed (knots)

Contextual information related to the reasons of the vessel’s loss or disposal.

Circumstances of loss or disposal
Draft

Name of ship as recorded on the record

Ship name

The process of transferring a vessel to water, but not necessarily her completion.

Launch Date

Name of the shipbuilder as it appears on the record.

Shipbuilder's signature

Abbreviations of the names of ports with Lloyd’s Register survey offices.

Port of survey abbreviations

Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.

Document identity

Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.

First entry?

The date of last visit by a surveyor.

Date of latest survey

Name of the individual/entity/organisation responsible for authoring the record

Document author

Location where a vessel’s survey was undertaken.

Location of Survey

Date of the meeting of the Classing Committee.

Date of Classing committee

The name of the port/place of destination given.

Destined voyage

Physical arrangement of a ship’s masts, sails and rigging.

Rig

Predominant material(s) utilised in a vessel’s construction.

Material of construction

A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).

Gross Register Tonnage

Is machinery fitted at the aft of the vessel?

Machinery aft?

Generally a smaller additional auxiliary boiler (often used while the vessel is at port).

Is a donkey boiler fitted?

Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.

Lloyd's Proving House?

The official record pronounced by the Committee

Loss or disposal

Recorded date for the vessel’s loss or disposal.

Date of loss, disposal or incident

Physical extent of a record.

Number of parts

Report an issue with this ship

Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.