Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Name of ship as recorded on the record
The process of transferring a vessel to water, but not necessarily her completion.
The port or place in which the vessel’s construction took place, at the time of writing.
Harrington ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
The listed port to which a given vessel belongs.
London ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
An officially licensed mariner (post 1850) holding ultimate command and responsibility for a vessel.
R W Hutchison ( Iron Ship Report for Calabar, 14th September 1874 1874 )
Hutchinson ( Engineer's Certificate for Calabar, 14th October 1874 1874 )
Location where a vessel’s survey was undertaken.
Liverpool ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Recorded information related to a vessel’s movements.
Liverpool; London; China ( Iron Ship Report for Calabar, 14th September 1874 1874 )
A vessel’s means of propulsion.
Is the steamer assisted by sail?
No ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Does the vessel possess an auxiliary power source?
Is electric lighting fitted to the vessel?
No ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Type and configuration of the engine(s) supplied for a vessel.
Compound Inverted Surface Condensing ( Engineer's Certificate for Calabar, 14th October 1874 1874 )
The year in which a vessel’s construction is completed.
1864 ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
R Williamson & Son ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Abbreviations of the names of ports with Lloyd’s Register survey offices.
Irn ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
The individual and/or organisation listed
R W Hutchison ( Iron Ship Report for Calabar, 14th September 1874 1874 )
Name of surveyor.
William C Davey; John George Kinghorn ( Iron Ship Report for Calabar, 14th September 1874 1874 )
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A; S S No 3-1874 ( Iron Ship Report for Calabar, 14th September 1874 1874 )
The name of the port/place of destination given.
London; China ( Iron Ship Report for Calabar, 14th September 1874 1874 )
Predominant material(s) utilised in a vessel’s construction.
Iron ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1122 ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Is machinery fitted at the aft of the vessel?
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No ( Iron Ship Report for Calabar, 14th September 1874 1874, Engineer's Certificate for Calabar, 14th October 1874 1874 )
Date in which construction of a vessel’s engines were completed.
1864 ( Engineer's Certificate for Calabar, 14th October 1874 1874 )
Have you noticed missing or incorrect data or images for this ship?
Please let us know and we will rectify the issue as soon as possible.