Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
07/03/1921
The year in which a vessel’s construction is completed.
1911
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Bremer Vulcan
Unique internal numbers used for identifying, referring and retrieving a specific survey report.
6681
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
100A1 Shelter dk with fbd 7.20; SS No 2-20; in red; LMC 7.20
Recorded information related to a vessel’s movements.
Atlantic Ocean
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
3601
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Physical extent of a record.
1
Name of ship as recorded on the record
Uckermark
The process of transferring a vessel to water, but not necessarily her completion.
__/__/1911
The port or place in which the vessel’s construction took place, at the time of writing.
Hamburg
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
J Puppi
The name of the port/place from which a vessel’s voyage originated.
New York
The name of the port/place of destination given.
Cadiz
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
5692
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Recorded information relating the specific cargo being conveyed.
general cargo; wheat, 6000 tons
Pertinent, useful or interesting recorded content.
Wreck report also mentions that the crew were picked up by the American steamer 'Cranford'
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.