Date recorded as the time of writing.
08/06/1933
The year in which a vessel’s construction is completed.
1896
The port or place in which the vessel’s construction took place, at the time of writing.
Belfast
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Postponed Surveys
The individual and/or organisation listed
Ditta Luigi Pittaluga
Recorded information related to a vessel’s movements.
Genoa
A vessel’s means of propulsion.
Steam
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
8283
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Transilvania, Artico, Tropic, European
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Harland & Wolff Ltd
The country in which the vessel’s construction took place, at the time of writing.
United Kingdom
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Deferred undertaking
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
5158
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Vessel is still laid up at Genoa and it is submitted that the 3rd Special Survey No 2 be deferred subject to the undertaking by the owners