Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
19/04/1922
The year in which a vessel’s construction is completed.
1894
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Alexander Stephen & Sons
The name of the yard where the vessel was built.
Linthouse
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Memo
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
A vessel’s means of propulsion.
Steam
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Mazagon
The process of transferring a vessel to water, but not necessarily her completion.
21/06/1894
Unique identifier for a given ship, it is assigned by a builder.
349
The port or place in which the vessel’s construction took place, at the time of writing.
Glasgow
Other/additional record(s) specifically mentioned, referenced or associated to another record.
Bordeaux 3093
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
Is the steamer assisted by sail?
No
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
Ministry of Marine has given instructions for the vessel to be laid up for sale with carrying the remaining requirements of the Special Survey No 2 in order to retain her class. It submits that action be deferred until next May
Have you noticed missing or incorrect data or images for this document?