Use the data export button to extract customised data sets from the Ship Plan and Survey Report Collection. Available in TSV and CSV formats.
Date recorded as the time of writing.
05/11/1893
The year in which a vessel’s construction is completed.
1864
The individual and/or organisation listed as having been responsible for constructing the vessel. This can/may be the same as the owner and/or manager.
Thomas Vernon & Son
Official administrative title (often printed) of a record used by Lloyd’s Register or external organisations.
Report of Total Loss, Casualty, &c./ Wreck reports
The individual and/or organisation listed
H Folsch & Co
The name of the port/place of destination given.
Valparaiso
Physical arrangement of a ship’s masts, sails and rigging.
S - Ship
Is the steamer assisted by sail?
No
A ship’s total internal capacity of a ship measured in register tons from the top of the floors to the tonnage deck.
1333
Confirmation as to whether the vessel was equipped with refrigeration machinery to aid in the transport of frozen or chilled cargo/goods.
No
Does the vessel possess an auxiliary power source?
No
Is electric lighting fitted to the vessel?
No
Physical extent of a record.
1
Name of ship as recorded on the record
Rajpoot
The process of transferring a vessel to water, but not necessarily her completion.
23/07/1864
The port or place in which the vessel’s construction took place, at the time of writing.
Liverpool
Records that constitute Lloyd’s Register’s first official encounters with a specific vessel, e.g. a survey report.
N
Classification symbol assigned to a vessel by Lloyd’s Register’s Classing Committee denoting the quality of construction and maintenance.
Missing since 8,92
Broad categories and subdivisions of vessels related to their purpose or function.
undefined
A vessel’s means of propulsion.
Sail
A ship’s total internal volume in ‘register tons’ (replaced by gross tonnage post 1982).
1333
Tonnage derived by deducting from the gross register tonnage the capacity that in unavailable for cargo, e.g. machinery space, fuel, crew accommodation etc.
1261
Is machinery fitted at the aft of the vessel?
No
Generally a smaller additional auxiliary boiler (often used while the vessel is at port).
No
Name of the Proving House responsible for the public testing and certification of a vessel’s anchors and/or chain cables.
No
Pertinent, useful or interesting recorded content.
She was reported as missing. Surveyors at Hamburg reported that she was insured by several Hamburg and other companies and most of them have already paid as she is considered as totally lost. The first Report of Casualty was deferred awaiting more details - see LRF-PUN-WR R-Z 1893-5W
Have you noticed missing or incorrect data or images for this document?
Please let us know and we will rectify the issue as soon as possible.